The project implemented a integrated sanitary wastewater treatment system on the construction site, using:
Anaerobic biodigester 10,000 liters for primary treatment;
Subsurface horizontal constructed wetland with HDPE blanket for effluent polishing;
Final destination through infiltration trenches dimensioned according to NBR 17076:2024.
System capacity:
He meets 200 people;
Flow rate 10 m³/day;
Organic load of 10,800 gBOD/d.
The treatment is carried out right on the construction site, eliminating the need for external transport and disposal.
Results and Objectives
Treating sanitary wastewater in a way sustainable and economical;
Reduce operational and logistical costs;
To improve water and soil quality;
Promote circular economy practices in the management of organic waste;
To guarantee environmental compliance.
Reduction of external wastewater disposal;
Improvement of environmental quality local;
Solution implementation sustainable and with low operating costs.