Brasil Pelo Meio Ambiente

ABOUT IT

The project began in 2010 with the migration of 10 buildings to incentivized and sustainable energy networks. Since then, the company has also established and encouraged projects to modernize air conditioning, optimize sites and equipment and demobilize offices.

In 2016, Algar became the first operator to implement photovoltaic solar energy in a station, with the pilot project of 10 generation plants next to the load - local self-consumption. In 2021, Algar totaled 24 buildings in incentivized and sustainable energy networks, making it possible, with the acquisition of I-RECs, to reach the 100% renewable energy mark.

Since 2020, a specific energy management platform has been developed for Algar Telecom's demands, with several management views and aligned with Analytics for monitoring and verifying consumption and cost reduction opportunities, which makes it possible to generate an integrated report that contains the above information and undergoes external certification.

Results and Objectives

2018 - Inauguration of the first remote self-consumption plant, UFV Capim Branco 1 in Uberlândia;

2016 - Pioneering implementation of photovoltaic solar energy for a station, with the pilot project of 10 generation plants next to the load - local self-consumption in Cemig's concession region.

2020 - Inauguration of the second plant, UFV Capim Branco 2, also in Uberlândia.

2022 - Inauguration of the first photovoltaic plant outside Cemig's concession region, this time in the town of Bela Vista de Goiás

2024 - Planning to deliver another major power plant, this time in the state of São Paulo in CPFL Paulista's concession area.

2025 – A ambição é inaugurar outras 17 usinas em outras concessionárias, trabalhando assim para ampliar assim o consumo de energia renovável da empresa em 18%.